
|
|
Medium-Scale Bridge Deck
The bridge deck under
construction. The hydronic
tubing, prior to pouring concrete.

Concrete
pouring.
The tubing is connected in a
reconfigurable manner.

The
finished bridge deck with the pond
filled.

Snow melting
on the bridge deck after 6" of snowfall.
BACK
|
|